VE19 Drywall work
The city of Büdelsdorf intends to build a new school building on the existing building for the Astrid Lindgren Primary School at the Büdelsdorf site. The new building will have classrooms and an auditorium. For the new building, an older part of the building was demolished and the site cleared. The property has an area of about 20,200 m². The property of the Astrid Lindgren Primary School is located in a central location.
The planned new building is two-storey and L-shaped. The total dimensions are 75 m and 45 m in length, each about 23 m in width. The cantilever of the upper floor on the west side forms a covered entrance.
Execution in solid construction. Load-bearing walls are made of reinforced concrete, parts in masonry.
Non-load-bearing walls are made of masonry and drywall in some areas.
The ceilings are made of reinforced concrete. Extensively green flat roof with external drainage.
Perforated façade with ribbon window, mullion-transom façade and facing masonry.
Services include:
-like. 680 m² Trockenbauwänden
-like. 2950 m² Abhangdecken
-ca. 144 m² acoustic ceilings
-ca. 250 m² suspended ceiling in the outdoor area