Planning services for the new construction of the 2nd gas storage tank after
- HOAI Part 3 Section 43 in conjunction with Annex 12 Engineering Structure,
- Part 4, Section 51 in conjunction with Annex 14,
- Part 4, § 55 in conjunction with Annex 15,
- as well as special services: according to HOAI plant 12 local construction supervision, installation 14 construction supervision of supporting structure, SIGE coordination
in the planning and execution phase, if required, preparation of approval documents in accordance with BImSchG, development of accident concept and a safety management system
Planning services for the new construction of a low-pressure gas storage facility with a volume of 5000 m³ on the area already planned for this purpose at the Kaditz wastewater treatment plant according to
- HOAI Part 3 Section 43 in conjunction with Annex 12 Engineering Structure,
- Part 4, Section 51 in conjunction with Annex 14,
- Part 4, § 55 in conjunction with Annex 15,
- as well as special services: according to HOAI plant 12 local construction supervision, installation 14 construction supervision of supporting structure, SIGE coordination
in the planning and execution phase, if required, preparation of approval documents in accordance with BImSchG, development of accident concept and a safety management system.
Connections to the existing biogas plant that have already been prepared must be used for the new gas pipeline. The biogas plant in the existing building is to be expanded by 2 water pots with a gas throughput of 1,620 Nm3/h and 1 condensate collection tank.