New construction of the traffic center NRW on the site of the Autobahnmeisterei Leverkusen:
communication networks
- about 38 IT racks with cold aisle containment,
- data cabling between IT racks in fiber optic and copper,
- Data connection to existing building via fiber-optic cable on redundant cable route via on-site piping in outdoor area with draw shafts,
- Termination on patch fields by fusion splice or in RJ45 module technology.
New construction of the traffic center NRW on the site of the Autobahnmeisterei Leverkusen:
communication networks
- about 38 IT racks with cold aisle containment,
- data cabling between IT racks in fiber optic and copper,
- Data connection to existing building via fiber-optic cable on redundant cable route via on-site piping in outdoor area with draw shafts,
- Termination on patch fields by fusion splice or in RJ45 module technology.