The purpose of this contract is:
(i) Phase I: the supply and installation of control cabinets for all the infrastructure comprising the ski lift located along Annette and Lubin Hill at SPA;
II) Phase II:
a) Inspection and preventive maintenance of all the infrastructures allowing the normal operation of the two cabins constituting the said lift;
b) The repair of these infrastructures in case of breakdown and malfunction.
i) Phase I: the supply and installation of control cabinets for all the infrastructures comprising the ski lift located along the Annette and Lubin Hill at SPA (see site plan in Annex V);
ii) Phase II:
a) Inspection and preventive maintenance of all the infrastructures allowing the normal operation of the two cabins constituting the said lift;
b) The repair of these infrastructures in case of breakdown and malfunction.