The objective of the work is to allow the construction of an extension of the sewerage network on Rue Belle Poule and Rue Filière.
This work will allow the collection, transfer and treatment of wastewater from 66 additional homes, which were previously in non-collective sanitation, to the treatment plant.
Trenching worko installation of 880 ml of Cr16 Ø200mm PVC manifold,
O Installation of 44 HDPE manholes Ø1000mm and Ø800mm
O Installation of 66 service boxes.
- Belle Poule Est pumping station:
o Sizing of the discharge systems at 7-8m3/h,
o Installation of 165 ml of HDPE 75 pipe
o Belle Poule Ouest pumping station:
O Dimensioning of the discharge facilities at 7-8 m3/h,
o Installation of 170 ml of HDPE 75 pipe
Network Acceptance TestsThe purpose of these tests is to check the quality of the workmanship in accordance with
Article 7 of the Order of 22 June 2007 of the Minister of Ecology, Development and
sustainable development (O.J. of 14/07/2007).
They are intended to provide decision-making support on the acceptance or refusal of acceptance
of the work carried out.
They will cover the entire sewerage network (pipes, manholes, etc.) (water)
worn)