Computer and high current installation for digitization in schools and educational institutions, Grundschule Frauenstraße 15.
Main amounts:
— approx. 2 distribution systems (01.01),
— approx. 100 built-in equipment/safety equipment (01.02),
— approx. 1,400 m of Lay systems (01.03),
— approx. 42 100 m of power and low current cable (01.04),
— approx. 500 installation devices (01.05),
— approx. 36 IT components (01.06),
— approx. 150 fire bulkheads (01.07).