The National Theatre at Goetheplatz in Mannheim is to be completely renovated due to considerable traces of use from years of operation. As part of the general renovation, it is intended to put the following services out to tender in the near future:
Metal construction work: tubular frame doors, steel doors, locksmith work
Steel doors:
- Technical processing 1 psch
- Standsicherheitsnachweis 1 psch
- Assembly plan, construction drawings 1 psch
- Steel-glass frame doors approx. 14 pieces.
- Sheet steel doors approx. 390 pieces
- Sheet steel sliding doors approx. 3 pieces
- Stainless steel frames approx. 2 pieces
- Stainless steel doors approx. 10 pieces
Accessories/ equipment:
- Overhead door closer 1-flg. approx. 287 pieces
- Overhead door closer with freewheel 1-flg. 4 pieces
- Integrated overhead door closer 1-flg. 3 pieces
- Integrated overhead door closers with freewheel 1-flg. 4 pieces
- Overhead door closer 2-flg. approx. 69 pieces
- Overhead door closer with freewheel 2-flg. 6 pieces
Integrated overhead door closers with freewheel 2-flg. 4 pieces
- Hold-open system holding magnet 1-flg. approx. 12 pieces
- Hold-open system holding magnet 2-flg. approx. 53 pieces
- Automatic door drive with fire protection 2flg. approx. 3 pieces
- Magnetic contacts, approx. 40 pieces
- Bolt contacts, approx. 30 pieces
- Ceiling smoke detector approx. 109 pieces
- Wall door stop stainless steel approx. 378 pieces
- Escape route terminals in AP approx. 5 pieces
- Central escape route control 1 piece
- Temporary door fittings approx. 95 pieces
- Erstinbetriebnahme ca. 320 Türanlagen
- Maintenance work approx. 4 years
- Documentation 1 psch
Planning services locksmith:
- Static calculation 1 psch
- Work and assembly plan 1 psch
Railings/ Handrails:
- Wall handrail steel tube approx. 530 running meters
- Sheet steel railing L approx. 6 running metres
- Handrail with steel posts approx. 2 running metres
Stahltreppen:
- Straight staircase, steel bolsters, grating steps, 18.5/ 26cm 18 pcs. approx. 6 pieces
- Edge edging stair eye, U-profile/ flat steel, approx. 64 running metres
- Railings, tubular steel posts, knee bars and handrails, flat steel, approx. 31 running metres
- Steel staircase coiled, steel cheeks, grating steps, platform, 19/ 26cm 11 pcs. 1 piece
- Spindle staircase, standpipe approx. 7.7m, press grate plate steps, wedge-shaped, tubular steel handrail, filling rods, 18.5/ 26cm, 4x 18 pcs.
Systemgitterwände:
- Gitterwand, H ca. 2,135m, ca. 355m²
- Gitterwand, H ca. 2.4m, ca. 18m²
- Gitterwand, H ca. 4.0m, ca. 33m²
- Lattice door sliding element approx. 13 pieces
- Lattice door 2-flg. 1 piece
- Lattice door 1-flg. approx. 10 pieces
- Roller scaffolding, H approx. 3.50m, 1 piece
Steel base level with gratings:
- HEB 200, L approx. 7,2m
- U 180, L ca. 5.7m
- IPE 180, L ca. 6.4m
- Gitterrostfläche ca. 9m²
- Tubular steel railing, plug-in mounting, upper belt, knee bar post, approx. 19lm
- Rolling scaffolding, 1 piece
Roller door:
- Roller door, approx. 2.26x 2.535m, 1 piece
Fluchtleiter Dachausstieg:
- Ladder, L approx. 3.2m, 2 pieces
- Ladder, L approx. 3.5m, 8 pieces
- Railing elements 10 pieces
- Platform grating, passage, approx. 1.25m², 10 pieces
Window:
- window with ventilation grille, Uw <= 1.3 W/m²K, total WxH approx. 0.995x 2.12m,
- Rotary wing WxH approx. 0.995x 1.525m, steel outdoor air grille WxH approx. 0.85x 0.55m, approx. 24 pieces
Follow-up work:
- Documentation 1 psch
- Maintenance approx. 4 years