Lot 2: Technical equipment
Delivery of railway power supply systems for the newly built Lindenau rectifier substation of Leipziger Verkehrsbetriebe (LVB) GmbH.
Plant planning for the advertised electrical components, technical coordination, production and delivery of the necessary
electrotechnical components.
- an SF6 medium-voltage switchgear
- two track rectifier transformers
- one rectifier return conductor unit (2x rectifier, 1x return conductor)
- one DC switchgear (10 fields in total)
- a self-contained switchgear, a control panel, a battery system and a telecontrol cabinet
- Replacement of the protection devices of a medium-voltage switchgear in a second GUW
- necessary system accessories
- Execution of tests and proof of the components
- Commissioning services and plant documentation