20E0451 (LBB NL Mainz) University of Applied Sciences Mainz Koblenzer Strasse - new building 2nd construction phase / heating - cooling.
Heating system:
- 1 pc. District heating transfer station 730 kW,
- 160 m plastic jacket composite pipe DN125, laid in the ground,
- 3 heating distributors,
- 13 heating pumps,
- 7 control valves,
- 161 pieces of shut-off and balancing valves,
- 11 heat meters,
- 1 pc pressure maintenance station with make-up device,
- 594 pcs of radiators,
- 1 340 m
- 16 pieces of radiant ceiling heating panels,
- 6 600 running meters of heating pipeline DN 15 to DN 50 made of copper pipe with press connection,
- 440 running meters of heating pipeline DN 25 to DN 125 made of steel pipe with welded joint,
- 3 470 running meters of insulation sleeve for laying on the unfinished floor,
- 474 fire protection penetrations.
Refrigeration system:
- 1 pc air-cooled compression chiller 300 kW for outdoor installation on the roof,
- 1 pc buffer tank,
- 3 pc cold distributors,
- 10 pc cooling water pumps,
- 3 control valves,
- 415 pieces of shut-off and balancing valves,
- 6 heat meters,
- 1 pc pressure maintenance station with make-up device,
- 1 820 running meters of cooling water pipe DN 15 to DN 50 made of copper pipe with press connection,
- 570 running meters of cooling water line DN 25 to DN 125 made of steel pipe with welded joint,
- 280 fire protection penetrations,
- 63 units of circulating air cooling units,
- 24 industrial distributors for surface heating / cooling systems with connection to on-site concrete core activation.