Terrain preparation; Civil engineering work.
Civil engineering work for the creation of traffic areas, rain retention basins and gas station track
Main services consist of:
- deliver 780 m of brand new track;
- Deliver 582 new concrete sleepers;
- deliver 4 new plastic or wooden sleepers;
- deliver 1 300 t of ballast;
- Install and plug 2 pieces of switches;
- Install and tamp 381 m of track;
- 350 m
- Delivery and installation of 310 m concrete cable duct;
- Deliver and install 2 cable ducts;
- Install 4 concrete feet for signals;
- Install 15 pieces of foundations for track field lighting;
- Make 4 pieces of foundations for the entry aid;
- 265 m
- Delivery and installation of 210 m low board;
- Establish 380 m of runway side drainage.