The state capital Magdeburg intends to expand the after-school care centre for the Sudenburg primary school. Current
300 after-school care places are available. Due to the increasing number of pupils, the primary school will be a
From the 2024/25 school year, 370 childcare places will be needed. In 2022, ESBau
in the form of a feasibility study. The resulting preferred variant 3-3 is the basis for
the EW construction to be created. A new extension is to be built on the school grounds for the additionally required
Childcare places are being set up. In order not to impair the tree population on the primary school grounds
the new building is positioned in such a way that the partial demolition of the existing latrine building is necessary
becomes. This is to be implemented in connection with the new construction project.
The planning services are commissioned in stages. First, the LPH 3 is retrieved. The
LPH 4 - 8 is commissioned depending on the confirmation of the planning results by the committees
of the city. A claim for further commissioning does not exist in the absence of fulfillment of the condition.
Planning services according to HOAI according to §§53-56 technical equipment
System groups 4 and 5
Planning services according to the technical equipment section 55 HOAI (2013) for the system groups:
4 high voltage systems
5 Telecommunications and information technology systems for the extension of a new hort building