The purpose of this contract is to ensure the extraction of the 3 primary heat exchangers of the Jules HOROWITZ (RJH) experimental reactor project.
The benefits are broken down as follows:
A firm share:
- Item 1: Definition studies, studies and deliverables, confers §7 and 3.2 of the CCTP
- Position 2: Tooling manufacturing
- Position 3: Site preparation: assembly of lifting trunnions, washer, screws
- Position 4: Cutting of the skirt, exit of interchange n°1 from the primary casemates, translation and installation of the interchange on its cradles. Packaging, refitting of shutters and inerting. Exit from the reactor vessel, conditioning and crane. Reference §3, 4, 5, 6, 7.2 of the CCTP.
- Position 5: Cutting of the skirt, exit of interchange n°2 from the primary casemates, translation and installation of the interchange on its cradles. Packaging, refitting of shutters and inerting. Exit from the reactor vessel, conditioning and crane. Reference §3, 4, 5, 6, 7.2 of the CCTP.
- Position 6: Cutting of the skirt, exit of interchange n°3 from the primary casemates, translation and installation of the interchange on its cradles. Packaging, refitting of shutters and inerting. Exit from the reactor vessel, conditioning and crane. Reference §3, 4, 5, 6, 7.2 of the CCTP.
An estimated share:
- Item 7: Transport of the heat exchangers to the repair site.