The Unstrut-Hainich district is planning to convert and renovate the Salza hall in Bad Langensalza, which was built in 1994 and is currently used for school sports and for the competitive sport of the Thuringian handball club. Two main measures are planned. In the first, a new grandstand building is to expand the hall's capacities and a directly attached player wing is to be created. In the second measure, the necessary renovation and remodeling measures will extend to the roof and facade of the Salza hall. The aim here is the sustainable construction of the building to ensure school sports operations and the modernization of the technical facilities to current standards.
- CM measurement,
- Prepare the subsurface (deep primer / primer) approx. 2 700 sqm,
- quartz primer approx. 850 sqm,
- screed filler approx. 1 800 sqm,
- leveling mass as height compensation approx. 2 350 sqm,
- coating insulation walls approx. 1 300 sqm,
- coating insulation floor approx. 1 700 sqm,
- sealing tape approx. 1 700 m,
- Sealing connections, corners, etc. approx. 200 pieces / approx. 200 m,
- wall tiles 60/60 approx. 1 100 sqm,
- wall tiles as a border approx. 160 sqm,
- floor tiles thin bed 60/60 approx. 1 250 sqm,
- floor tiles epoxy resin 60/60 approx. 170 sqm,
- floor inlets approx. 48 pieces,
- base tiles approx. 450 m,
- tiles on various surfaces approx. 80 sqm,
- stainless steel profiles, dividing rails, angles etc. 300 m,
- silicone joints approx. 2 400 m,
- grout acrylic approx. 2 100 m,
- make holes in tiles approx. 300 pieces,
- Remove edge insulation strips approx. 2 100 m,
- granite windowsill approx. 70 m,
- cleaning mat about 10 pieces