Replacement service with buses cancellation PTS 2024; Terminal 2 Munich Airport,
The project was triggered by the scheduled six-week outage of the passenger transport system (PTS) between Terminal 2 and satellite (SAT). The most important objective of the contract is to provide a particularly safe, trouble-free, mixing-free and damage-free transport of passengers (PAX) and employees (MA), e.g. the airport, the airlines, the authorities, tenants and service providers as well as their belongings during the entire scheduled downtime of the PTS during the entire scheduled downtime of the PTS in the form of a PTS replacement service (PEV) by means of defined apron-side bus connections, which stop at fixed, airside stops in the security area.
Details on the content of the service can be found in the informational tender documents in accordance with para. I.3.
Replacement service with buses cancellation PTS 2024; Terminal 2 Munich Airport,
The project was triggered by the scheduled six-week outage of the passenger transport system (PTS) between Terminal 2 and satellite (SAT). The most important objective of the contract is to provide a particularly safe, trouble-free, mixing-free and damage-free transport of passengers (PAX) and employees (MA), e.g. the airport, the airlines, the authorities, tenants and service providers as well as their belongings during the entire scheduled downtime of the PTS during the entire scheduled downtime of the PTS in the form of a PTS replacement service (PEV) by means of defined apron-side bus connections, which stop at fixed, airside stops in the security area.
Details on the content of the service can be found in the informational tender documents in accordance with para. I.3.