The turnkey realization of a 4-speed secondary school including a school sports hall as a two-field hall is planned.
The construction project also includes the associated outdoor facilities as well as the furnishing / equipment of the school and sports hall.
In advance, an existing building was demolished (school prefabricated building) and a construction site clearing with Flächenentsiegelung and area leveling carried out.
Services in the school and in the sports hall:
- Substrate preparation (about 360 m
- Porcelain stoneware floor tiles 60/60 cm (approx 360 m
- Wall tiles made of fine stone 30/60 cm (about 880 m
- Tile mirror 15/15 cm (about 7.25 m
- tiles of window reveals and parapets,
- Reviklappen in different dimensions (total 26 pieces),
- transitional profiles to other floor coverings,
- Permanently elastic sealing (approx. 1 180 m
- Indoor window sills made of artificial stone (about 450 m).