Redesign of the streets, paths and squares on the Tribseer Damm - 2nd construction phase from the intersection Alte Rostocker Straße to the junction Carl-Heydemann-Ring and the Tribseer Damm - junction Carl-Heydemann-Ring.
The order is placed in stages for the Tribseer Damm - 2nd construction phase and the Tribseer Damm - intersection Carl-Heydemann-Ring. With the conclusion of the contract, the Hanseatic City of Stralsund transfers the services mentioned under point 4 to the contractor for the Tribseer Damm - 2nd construction phase.
The services are to be broken down into sections.
The Contractor has no legal claim to the transfer of further services - individually or as a whole.
Execution period Planned start of construction 2nd construction phase (1st stage) 1.4.2020 Planned end of construction 31.12.2020 Planned start of construction Junction Carl-Heydemann-Ring (2nd stage) 1.4.2021 Planned end of construction 1.6.2022.
Erstabsteckung:
Surveying work for the initial stakeout of the carriageway axis and creation of fixed height points.
Creation of an inventory plan on a scale of 1: 200 in the dwg. and pdf format including for the entire renewed area mentioned above.
The data are to be transferred according to the following reference systems:
Position reference: ETRS 89 UTM image, zone 33 Height reference: DHHN 92.