Heating systems and central water heating systems (DIN 18 380);
Construction of a new heating plant in building A10 including reserve for later
CHP integration with connection and adaptation of the existing local heat distribution.
The service essentially consists of:
- 1 woodchip boiler 450 kW with control unit, electrostatic precipitator,
Screw conveying, ash discharge, exhaust system, rough gas neutralization
- 1 piece of storage technology wood chips approx. 82m2 with filling hopper, filling and
Distribution screws, moving floor, oil hydraulics, control unit
- 1 pc gas low-temperature boiler 560 kW with burner, gas control system,
Exhaust gas control, exhaust system, gas transfer station
- 1 St Heizwasserspeicheranlage 3x4,5 m3
- 1 pressurization system with 1600l accumulator
- 12 centrifugal pumps
- 95 pcs fittings up to DN100
- 900 m steel pipe up to DN125 incl. insulation
- 300 m stainless steel pipe up to DN100 incl. insulation
- 120 m sleeveless drainage pipe cast iron up to DN 100
- 1 pc I&C technology, 200 data points incl. control cabinets and electrical installation
as well as dismantling of existing pipes, fittings, insulation,
Electrical installation mainly in control panels, partly contaminated with KMF
- 95 pcs fittings up to DN100
- 900 m steel pipe up to DN125 incl. insulation
- 300 m stainless steel pipe up to DN100 incl. insulation
- 120 m sleeveless drainage pipe cast iron up to DN 100
- 1 pc I&C technology, 200 data points incl. control cabinets and electrical installation
as well as dismantling of KMF-contaminated pipelines, fittings, insulation and
Electrical installation mainly in control panels.