Sewer construction, district heating pipe construction, gas and water pipeline construction, civil engineering work for e-supply and telecommunications, road construction work
The present contract relates to the construction site between the streets Bornberg and Weinberg. The surface is paved throughout the area.
The construction site was divided into three construction phases:
BA Bornberg to Leipziger Straße
BA Leipziger Straße to Albert-Schweitzer-Straße
BA Albert-Schweitzer-Straße to Weinberg
A total of approx. 900 m of double drainage and sewer (mainly DN 1300 / DN 400) will be replaced.
In addition, the following supply systems will be replaced or replaced:
Gas-Hochdruckleitung: 740 m DN 150 ST KA
Gas-Niederderuckleitung: 110 m DN 300 ST KA
Gas house connection pipes: 6 x replacement
Water supply lines: 910 m OD 110 PE XA XI
560 m DN 300 GGG ZnAl ZM
Water house connection pipes: 12 x replacement
19 x Umbindung
Electricity supply: 370 m 1 x 10 KV
1.110 m 2 x 1 SQ