B 87 BW 0819U Bridge Rödigen over the B 87 - new construction
The main services of the construction project are:
Building 4Ü
390 m Rüttelstopfsäulen
22200 m³ earthworks / excavation pits
10,500m² of qualified soil improvement
900m³ Stahlbetonarbeiten
92 m Stahlgeländer
340 m² bitumen welding membrane
205 m² paving work
Track construction
mow approx. 50,000 m² of vegetation
Removal of approx. 5,800 m³ of topsoil, install on areas of the AG
approx. 1,650 m³ of topsoil, cover
Loosen approx. 2,800 m³ of soil, install on areas of the AG
Supplying and installing approx. 20,700 m³ of soil
approx. 2,550 m² of banquet production
approx. 13.000 m² Rasenansaat
approx. 420 m of infiltration pipeline, DN 100
approx. 26 pcs FT shaft supply, install, DN 600
approx. 5 m culvert DN 300 StB
Produce approx. 2,300 m troughs
Produce approx. 400 m trough-trench system
Produce approx. 2,600 m³ of frost protection layer
Produce approx. 9,300 m² of ballast base course
Produce approx. 2,300 m² of surface course without binders
Produce approx. 5,250 m² asphalt base course d=10 cm
Produce approx. 5,150 m² asphalt surface course d=4 cm
Ground improvement
approx. 15,800 m² of qualified soil improvement
approx. 2,200 m of vibrating tamping columns
Supplying and installing approx. 6,800 m² of geogrids
approx. 3,200 m³ of mineral mixture, install
Signage work
Marking work
Installation of vehicle restraint systems
Work on vegetation areas, development maintenance