Construction of new residential apartment buildings (ARA) as a fixed price total contract.
The offer must be delivered to the subscriber in a sealed envelope marked with.
'' Contract offer at Yli-Jurvankatu 7 in Hyvinkää ''.
The plot is located south of Hanko-Hyvinkää in the Metsäkalteva district.
Access to the site takes place along almost completed streets. Yli-Jurvankatu is a street that ends for the time being. The plot is forest, all trees must be felled and removed from the plot. The plot has a thin layer of humus. The construction of the site requires the completion of planned fillings.
The plot will consist of 2 five-storey residential blocks of flats, bicycle sheds, walkways, escape routes and courtyards for planting, living and parking. Some of the apartments and common areas are on the 1st and 5th floors. 2 to 4. on the floors there are only residential apartments. The buildings are dotted houses with ridge / console roofs. The facades are made of clean brick. Waste management is organized by a deep collection system. The parking lots on the plot are courtyards.
There are no underground basements in the buildings. The buildings have a ventilated floor.
Buildings are set up by piling. The property will receive district heating. Most of the premises are heated with water-based underfloor heating. A delay system will be built on the stormwater. The ventilation room is located above the floors above the other rooms.