The renovation of a hydraulic spinning press dedicated to the hot shaping of long products.
— phase A: mechanical, hydraulic and electrical studies.
This phase includes a stop point (No. 1) lifted upon receipt of the studies by the ECA;
— phase B: dismantling, transport and inspections and inspections in the factory.
This phase includes a stop point (No. 2) lifted upon receipt of inspections by the ECA;
— phase C: factory reception of the renovated press;
— phase D: installation and testing at the CEA site and final reception.