Specialist planning Structural design according to Part 4 Section 1 HOAI for the renovation and partial new construction of the property Marktplatz 9, Thurnau (former bakery Gräf) to the castle hotel as component (BT) 1 (client Markt Thurnau). The renovation of the castle Thurnau, market square 1, Storchenbau, Kemenate, probably 2 to 3 floors - further floors after securing the financing and vaulting as a component (BT) 2 and the renovation / technical conversion of the buildings Oberer Schlosshof as a component (BT) 3 (Client Gräflich Giech'sche Spitalstiftung). The 3 components, as described above, are billed as 1 action.
The technical planning of the load planning according to § 51 HOAI is to be commissioned for the partial new construction of component 1, and renovation of the buildings of components 1 to 3. For all components the service phases 1 to 6 and 8 with the conclusion of the contract, a partial or component-wise and stepwise commissioning is agreed , The respective construction phases are expected to be components 1 to 3. Further subdivision is reserved. Power stage 1 includes power phases 1 and 2 for the respective components. Power stage 2 includes power phases 3 and 4 for all components, power stage 3 power phases 5 and 6 for all components, and power stage 8 special power stage performance features co-processed building fabric is specified / requested with the request to submit the initial offer. Also special services, such as evidence of constructive fire protection, if necessary, the participation in the procurement of funds and the building go-to Festatellung and monitoring of the stability-related influences as a special achievement of the performance phase 9. These are called up as needed. A basic fire protection concept for components 2 and 3 is available. The test expert fire protection is commissioned on site. In detail, the buildings or parts of buildings to be processed are to be taken from the site plan enclosed with the call for tenders or the description. In the case of the services, partial demolition of the building in the marketplace 9 must be considered. The contract period does not include the special services of the Lph 9, which are commissioned beyond the basic services. The order value and the term are forecast values.