Earthwork; concrete work and reinforced concrete work; metal construction work; drainage sewer works; road construction works – asphalt surface layers; Electrical, security and information technology systems
- 36,418 m³ earthworks, terrain profiling for routes and structures;
- Supply and install 1,020 m³ of sand 0/2-0/4 filling material;
- 21,530 m² of fouling removal and disposal;
- Expose and dispose of 2,230 m of buried piping and cables;
- 1 piece dismantling and dismantling of a technical plant with pumping station;
- Supply and lay 266.5 m of steel protection pipes DN100 to DN400;
- Supply and install 280 m of cable conduit DN50, DN100;
- Supply and install 220 m of DN32 fiber optic cable conduit;
- Supply and move 2 pieces of PEHD PE100 shaft structure DN1800;
- Supply and move 2 pieces of compact B+E valve shafts;
- Deliver and assemble 2 pieces of access stairs to HRB 4;
- 505.1 m PEHD PE100 SDR17 da225 supply and lay and remove weld bead inside;
- Deliver and assemble 1 piece of culvert structure with wing walls;
- 247 m² of farm roads from eco-farm road pavement;
- 745 m² of service roads in asphalt construction;
- supply and assemble 45 pieces of fittings and fittings PEHD PE100 SDR17;
- 1 piece catwalk, L=9.5 m, W=1.5 m, steel fz deliver and assemble;
- 1 piece of new construction of a technical plant with pumping station;
- Deliver and assemble 15 pieces of pipe support systems loose and firm;
- Supply, lay and install 2,221 m of FM and LV cables;
- Deliver and assemble 1 piece of telecommunications distributor fully equipped;
- Deliver and assemble 1 piece of E-MSR control cabinets fully equipped;
- Manufacture and assemble 84 m of metal railings;
- Deliver and assemble 1 piece of RADAR measurement technology on steel girder structure;
- Supply and erect 5 pieces of seepage line gauges and deformation measuring points.