Construction work | Tenderlake

Construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
23 November 2022
Closing Date:
23 January 2023
Location(s):
CH0 SCHWEIZ/SUISSE/SVIZZERA (CH Switzerland/SCHWEIZ/SUISSE/SVIZZERA)
Description:
Bypass Cham–Hünenberg (UCH) VOMA 4 - IP Stumpen, Cham

Ground work, flushing boreholes, new road construction Duggeli - Stumpen (approx. 250m), works pipeline structures, excavation work Portal Stumpen, construction of installation site stumps, construction of connection shaft Städtlerwaldstollen

- Bodenabtrag: 14'250m³

- Excavation: 18'750m³

- Kiessand: 14'600m³

- Bituminous coverings: 2'900t

- Inlet shafts: 35pcs.

- Inspection shafts: 60pcs.

- Entwässerungsleitungen: 3'000m

- Rohrblöcke: 2'430m

- Spülbohrung: 200m

- Concrete: 150m3

- Armouring: 18t

- Benchmark of benefits: CHF 5.5 million

Ground work, flushing boreholes, new road construction Duggeli - Stumpen (approx. 250m), works pipeline structures, excavation work Portal Stumpen, construction of installation site stumps, construction of connection shaft Städtlerwaldstollen

- Bodenabtrag: 14'250m³

- Excavation: 18'750m³

- Kiessand: 14'600m³

- Bituminous coverings: 2'900t

- Inlet shafts: 35pcs.

- Inspection shafts: 60pcs.

- Entwässerungsleitungen: 3'000m

- Rohrblöcke: 2'430m

- Spülbohrung: 200m

- Concrete: 150m3

- Armouring: 18t

- Benchmark of benefits: CHF 5.5 million

Download full details as .pdf
The Buyer:
Tiefbauamt des Kantons Zug
CPV Code(s):
45000000 - Construction work