The subject of the Contract is "Construction of the high-pressure gas pipeline DN500/400 MOP 2.5 MPa between Dąbrowa Górnicza and Szopienice,(parts 3 and 4
on the section marked in the project documentation as 3 and 4. The section in question is localised in the range from
Czarna Przemsza River (in the area of 3 Maja Street) to the allotment gardens rod "Górnik" in Sosnowiec."
"Construction of the high-pressure gas pipeline DN500/400 MOP 2.5MPa between Dąbrowa Górnicza and Szopienice, on the section marked in the project documentation as 3 and 4. The section in question covers the scope from the Czarna Przemsza River (in the area of 3 Maja Street) to the allotment gardens rod "Górnik" in Sosnowiec" is implemented as part of a larger investment project (Project) entitled "Reconstruction of the Dabrowa Górnicza – Szopienice gas pipeline". for which on 29.03.2019 a co-financing agreement was concluded No. POIS.07.01.00-00-0018/17 as part of measures 7.1 – Development of intelligent energy storage, transmission and distribution systems priority axis VII – Improvement of energy security of the Operational Programme Infrastructure and Environment 2014-2020. in accordance with the program assumptions and requirements contained in the documentation prepared by the Ordering Party.
A detailed description of the Object of the Order, the obligations of the Contractor, material requirements and for fittings, and other conditions and rules for the execution of the order, contains Annex No 1 to SWZ - Description of the Subject of the Order and the Obligations of the Contractor (OPZ).