The service is divided into 8 lots subject to 7 phases. All batches are concerned by all phases, according to the conditions indicated in the consultation file. The overall period for the performance of all benefits is a maximum of 50 months, broken down as follows:46 months for basic benefits3 months for PES (these three 3 months are additional to the 46-month period for basic benefits, if PSEs are maintained)1 month of preparation. These deadlines are subject to the optimized deadlines that candidates are allowed to propose in the deed of commitment. Batch delay repair is also indicated in the consultation file. These deadlines count for all lots, the preparation period and the acceptance operations
Electricity strong currents and weak currentsElectricity strong currents and weak currents
heating - ventilation - compressed airheating - ventilation - compressed air
Interior fittings - signageInterior fittings - signage
base-Lifebase-Life
StructureStructure
AsbestosAsbestos
Metal frameMetal frame
BlanketBlanket