Rehabilitation of the Fleury 1 and 2 toll gates (A6): repair/reinforcement of the metal frame and restoration of the anti-corrosion protection of the awning.
Rehabilitation of the Fleury 1 and 2 (A6) toll gates: repair/reinforcement of the metal frame and restoration of the anti-corrosion protection of the awning in its entirety.
The market includes a firm slice and an optional slice.
Firm slice: Fleury 1
- Zone Containment/Track & Equipment Protection - 1Ft
- Sheet metal removal/reinstallation - 270 m²
- Cornice Removal/Reinstallation - 220 ml
- Washing and anti-corrosion protection of metal structure - 3,800 m²
- Underside washing of low steel - 1,500 m²
- Angle section reinforcement - 400 ml
- Replacement of slatted stair tread - 250 ml
Optional slice: Fleury 2
- Zone Containment/Track & Equipment Protection - 1Ft
- Cornice Removal/Reinstallation - 160 ml
- Washing and anti-corrosion protection of metal structure - 1,800 m²
- Washing and protection of low steel soffit - 800 m²
- Removal of a staircase - 1 Ft
- Modification of ladder to crinoline - 1 Ft
These quantities are given for information only.