Relocation of federal highway 3 from northeast of Celle (B191) to southeast of Celle (B214) (Allerquerung OU Celle).
Construction of new bridge structures:
- Ce 21, overpass replacement route Berkefeldweg over the B3
Span: 27.94 m
Width betw. Railings: 11.30 m
Reinforced concrete substructures, prestressed concrete superstructure.
- Ce 21a, bat bridge over the B3
Span: 26.47 m
Width betw. Railing: 13.50 m
Reinforced concrete frame structure.
- Ce 22, flyover of the Fasanenweg / Fledermausbrücke cycle path over the B3
Span: 30.52 m
Width betw. Railings: 12.00 m
Reinforced concrete substructures
Prestressed concrete superstructure.