Supervision of drilling yards, workover and mining closures ensuring, through the professional figures of:
- drilling & completion engineer,
- drilling & completion supervisor,
- drilling & completion fluids supervisor and wellsite geologist,
the execution of the activity in compliance with the regulations in force - drilling and completion engineering services - operational supervision of "rigless" construction sites through the profession of rigless supervisor. (Main activity: supervision of drilling sites, workover and mining closures).
The following are subject of the contract:
- supervision of drilling sites, workover and mining closures (main activity)
- drilling and completion engineering services
- the supervision services of "rigless" construction sites.
Through the professional figures of drilling & completion engineer, drilling & completion supervisor, drilling & completion fluids supervisor, wellsite geologist and rigless supervisor the execution of the activity must be ensured with respect to:
- of the provisions of the contract, in compliance with the requirements established by the health, safety and quality policy document, with the client's manuals and procedures, with the international technical standards recognized in the oil sector (API, ISO, etc.) ,
- of the laws and regulations in force in the national territory,
- of the environmental requisites foreseen by the legislation on the protection of the environment, the requirements on the safety of workers and health protection and in compliance with the current Italian legislation on mining (Legislative Decree 624/96), safety on the work (Legislative Decree 81/08) and Seveso III directive (Legislative Decree 105/15).
Specifically, the contractor must:
- assume direct responsibility as an active part in ensuring the safety of the well in an emergency situation, in coordination with the drilling contractor and other service companies and as technical support to the overseer and the manager in charge of emergency management,
- have a qualified staff of resources to manage at least n. 2 simultaneous "drilling and completion" rigs,
- if requested by the client, operate as «SISTRI delegate» on behalf of STOGIT SpA through the «drilling & completion supervisor» and «drilling & completion fluids supervisor» figures,
- Ensuring timely follow-up reporting of activities and managing correspondence with the client,
- ensure the completion of daily reporting on site by using the «wellview» application, which will be made available on the hardware infrastructure by the client.
The figures of «drilling & completion supervisor», «drilling & completion fluids supervisor», «rigless supervisor» must be in possession of the well control certification (IWCF) valid during the performance of the activities.
The roles and responsibilities of the contractor in the management of emergencies will be defined in the documents of the "emergency role" of the site, in the "emergency plan of the well" and in the DSSC, supplied later.
The organizational structure required of the contractor includes site supervision both for well operations (drilling, completion, workover and mining closure) and for operational geology activities.
In particular, for drilling site (including side-track) and completion must be present:
- n. 4 «drilling & completion supervisor»,
- n. 2 «drilling & completion fluids supervisor»,
- n. 2 «wellsite geologist».
The following must be present for workover and mining construction sites:
- n. 4 «drilling & completion supervisor»,
- n. 2 «drilling & completion fluids supervisor»,
For rigless construction sites must be present:
- n. 1 «rigless supervisor».
The operational structure, the type of supervision and the amount of resources to be used, requested by the contractor for the execution of the services, may vary depending on the operational phase of use of the drilling rig.
The services requested from the contractor may be of a discontinuous nature depending on the client's requirements; in these periods services will not be provided by the contractor and availability rates will not be recognized.