Execution of sanitary work at the Braunenberg Education Campus (BCB) in Aalen-Wasseralfingen
Execution of sanitary work at the Braunenberg Education Campus (BCB) in Aalen-Wasseralfingen:
Reassembly of:
Furnishings with accessories approx. 90 pcs.;
Drinking water pipes (composite pipe) with insulation DN10 – DN32 approx. 900 m;
Drinking water pipes (stainless steel pipe) with insulation DN 10 – DN65 approx. 650 m;
Plastic waste water pipes with insulation DN50 – DN100 approx. 720 m;
Rainwater pipes made of cast iron pipe with insulation DN50 – DN100 approx. 90 m;
Dismantling and disposal of drinking water pipes insulated approx. 80 m;
Dismantling and disposal of dirt-u. Rainwater pipes approx. 30 m;
Dismantling and disposal of furnishings approx. 15 hours;
Dismantling and disposal of components (fittings/distributors) approx. 10 pcs.