structural work
Reinforcing steel: approx. 4,260 kg
In-situ concrete (without concreting shafts): approx. 12 m³
Prefabricated parts (total volume): approx. 62 m³
Rolled steel: approx. 15,000 kg
Trapezoidal sheet metal (ceiling and roof): approx. 61 m²