The construction and reconstruction of connection lines to the public sewage and rainwater sewer on behalf of the Starnberger See wastewater association is carried out via individual orders from the framework contract.
Small expansions and repairs to the existing sewage and rainwater sewer network are also planned. The requirement of new construction measures depends on the planned structural and civil engineering measures in the individual parts of the municipality.
New construction of connection lines and immediate measures for the years 2021 to 2023. North-east areaThe construction and reconstruction of connection lines to the public sewage and rainwater sewer on behalf of the Starnberger See wastewater association is carried out via individual orders from the framework contract.
Small expansions and repairs to the existing sewage and rainwater sewer network are also planned. The requirement of new construction measures depends on the planned structural and civil engineering measures in the individual parts of the municipality. Over the past few years, around 150 house connections have been set up every year, spread across all communities. The house connection usually consists of a connection piece on the main sewer, an approx. 10 meter long connection line and a house connection control shaft DN1000 on the private property.
The catchment area of the Starnberger See wastewater association includes the entire lake area with the municipalities of Berg, Münsing, Seeshaupt, Bernried, Tutzing, Feldafing, Pöcking and the city of Starnberg.
Lot 1: North-East sub-area:
Urban area of the city of Starnberg, municipalities Berg and Münsing
These are individual orders with a small scope and small quantities. A changing area of application within the respective lot is possible every working day.
New construction of connection lines and immediate measures for the years 2021 to 2023. South-west areaThe construction and reconstruction of connection lines to the public sewage and rainwater sewer on behalf of the Starnberger See wastewater association is carried out via individual orders from the framework contract.
Small expansions and repairs to the existing sewage and rainwater sewer network are also planned. The requirement of new construction measures depends on the planned structural and civil engineering measures in the individual parts of the municipality. Over the past few years, around 150 house connections have been set up every year, spread across all communities. The house connection usually consists of a connection piece on the main sewer, an approx. 10 meter long connection line and a house connection control shaft DN1000 on the private property.
The catchment area of the Starnberger See wastewater association includes the entire lake area with the municipalities of Berg, Münsing, Seeshaupt, Bernried, Tutzing, Feldafing, Pöcking and the city of Starnberg.
Lot 2: South-West sub-area:
Municipalities of Seeshaupt, Bernried, Tutzing, Feldafing, Pöcking
These are individual orders with a small scope and small quantities. A changing area of application within the respective lot is possible every working day.