The realization of new construction of swimming pool De Plons in the municipality of Beuningen. The Swimming Pool replaces the current swimming pool De Plons at a new location.
The contract covers the main lines:
• Carrying out the design and consultancy work required for the realization of the project in accordance with the demand specification;
• The realization of the new building;
• Active aftercare of 24 months;
• Optimization of energy over a period of 24 months.
See also the Selection Guide 'Design & Build Multifunctional Swimming Pool Beuningen'.
Multifunctional Swimming Pool BeuningenThe contract covers the main lines:
• Carrying out the design and consultancy work required for the realization of the project in accordance with the demand specification;
• The realization of the new building;
• Active aftercare of 24 months;
• Optimization of energy over a period of 24 months.
See also the selection guide.