Routing basic lines
Lay approx. 50 m of underground cables in existing trenches
- Dismantle, dispose of and reinstall approx. 150 m well pipe
- Approximately 900 m of local heating pipes will be laid from the technical center to the underfloor structures in trenches made on site.
- Around 950 m of local heating pipes are laid around the labyrinth in trenches made on site.
- Lay approx. 26 m of PP pipe in DN 400 in a trench
- Make a suction tower in DN315
- Lay approx. 280 m of polypropylene ventilation pipes in the trench