"New construction of the fire station of the volunteer fire brigade of the city of Bad Segeberg (BRI approx. 22,227 m³) as a two-storey solid structure, divided into 2 construction phases consisting of the following services:
Roof waterproofing work consisting of:
Flat roof waterproofing with bitum. Roofing membranes
Extensive roof greening
Rope safety system for maintenance work
2 roof steps
2 SHEV light domes
1 glass light strip with SHEV opening
1 terrace with WPC floorboards"
"The essential scope of the entire construction project divided into 2 construction phases consists of the following services:
1st construction phase, construction period: 01/2024 to 03/2024
2nd construction phase, construction period: 05/2025 to 07/2025
Roof waterproofing work:
Vapour barrier bituminous approx. 1.975m² (1.BA), approx. 1.145m² (2.BA)
Roof inlets (pressure drainage) 6 pieces (1.BA), 5 pieces (2.BA)
Ventilation hoods (dirty water) 10 pieces (1.BA), 8 pieces (2.BA)
V2a vent pipes (outgoing air) 5 pieces (1.BA), 1 piece (2.BA)
V2a louvre hoods (outgoing air) 5 pieces (1.BA), 1 piece (2.BA)
V2a emergency overflows with spears 6 pieces (1.BA), 5 pieces (2.BA)
Roof hatch with scissor staircase (aluminium coated) 1 piece (1.BA)
SHEV dome 1,2x1,2m (as flat glass window) 2 pieces (1.BA)
Modular skylight system 2x7m with SHEV opening 1 piece (2.BA)
EPS-Gefälledämmung i.M. 260mm ca. 1.935m² (1.BA), ca. 1.145m² (2.BA)
Dämmkeil ca. 248.5m (1.BA), ca. 250m (2.BA)
EPS wall insulation attic 160mm approx. 145m² (1.BA), approx. 145m² (2.BA)
EPS wall insulation on attic 100mm approx. 43.5m² (1.BA), approx. 43.5m² (2.BA)
Attica, wooden UK made of OSB boards approx. 217m (1.BA), approx. 215m (2.BA)
Attic cover plate, aluminium powder-coated approx. 217m (1.BA), approx. 215m (2.BA)
Roof waterproofing bituminous, 2-ply approx. 1,975m² (1.BA), approx. 1,145m² (2.BA)
Roof waterproofing on Components approx. 248.5m (1.BA), approx. 250m (2.BA)
Extensive greening with sedum sprouts + small perennials approx. 1,415m² (1.BA), approx. 855m² (2.BA)
Kiesleist Alu ca. 400m (1.BA), ca. 330m (2.BA)
Edge and middle strips of gravel approx. 365m² (1.BA), approx. 285m² (2.BA)
Betonlaufplatten ca. 142,5m (1.BA), ca. 52m (2.BA)
Fertigstellungspflege ca. 1.415m² (1.BA), ca. 1.145m² (2.BA)
Rope safety system for maintenance work approx. 186m (1.BA), approx. 45+35+53m (2.BA)
Roof climb 3x3 steps 1 piece (2.BA)
Roof climb 2 steps+ladder h 1,12m 1 piece (2.BA)
Terrace vapor barrier bituminous approx. 110m² (2.BA)
Terrace roof inlets (free-level drainage) 2 pieces (2.BA)
Terrace V2a emergency overflows with spear 2 pieces (2.BA)
Terrace EPS slope insulation i.M. 260mm approx. 110m² (2.BA)
Terrace Dämmkeil ca. 56,5m (2.BA)
Terrace roof waterproofing bituminous, 2-ply approx. 110m² (2.BA)
Terrace Roof waterproofing on aufg. Components approx. 56.5m (2.BA)
Terrace EPS wall insulation attic 120mm approx. 7,5m² (2.BA)
Terrace EPS wall insulation on attic 100mm approx. 4.5m² (2.BA)
Terrace attic, wooden UK made of OSB boards approx. 22m (2.BA)
Terrace attic cover plate, aluminium powder-coated approx. 22m (2.BA)"