Description:
Implementation of line courses — Service A (split into 4 parts)

The subject of the contract is the provision to the Contracting Authority of Service A, consisting in the transport of Shipments (including Postal Shipments), including Shipments of which will constitute dangerous goods within the meaning of Article 2 (4) of the Act on 19 August 2011 on Carriage hazardous materials under which the Contractor is obliged to accept consignments for carriage at the place and time limit set out in the Schedule for the implementation of Service A, as set out in Annex 1 to the draft contract, and issue the consignments accepted for carriage at the place specified therein appendix.

Implementation of line courses (Service A) - course no 14/142

1. The subject of the contract is the provision to the Contracting Authority of Service A, consisting of the transport of Shipments (including Shipments containing Postal Shipments), including Contracts of which will constitute dangerous goods within the meaning of Article 2 (4) of the Act on 19 August 2011 the transport of hazardous materials under which the Contractor is obliged to accept consignments for carriage at the place and date set out in the Schedule for the implementation of Service A, as set out in Annex 1 to the draft contract, and issue the consignments accepted for carriage at the place specified therein appendix.

2. Under the provision of Service A, the Contractor undertakes:

(a) that the vehicle using which the Consignments are transported will arrive at the place of issue of the Shipments within the time limit set out in the Schedule for the implementation of Service A, as set out in Annex 1 to the draft agreement,

(b) where the place of acceptance of consignments for carriage is not the organizational unit of the Contracting Authority - the loading of the Consignments onto the vehicle and their placement in the vehicle at the place of acceptance of the consignments for carriage,

(c) where the place of release of the Shipments is not the organizational unit of the Ordering Party - the discharge of the Shipments from the vehicle at the place of release of the Shipments.

Course No: 14/142

Course coverage: Bailiks - Zielona Góra - Bailiks

Course circulation days: sb and St.

The maximum amounts of services that can be commissioned to the Contractor by the Employer as part of the contract:

— maximum number of kilometers with the right option (100%) - 62 992,

— the amount of kilometers (80%) - 50 394,

— the number of kilometres covered by the right of option (20%) -12 598.

3. The Contracting Authority provides for the award within 2 years from the date of award of this contract, the contract referred to in Article 388 (2), point (c) of the PZP. The scope of the above orders will consist of repetition of services from the basic order and will cover the following quantities of kilometres:

— maximum number of kilometers with the right option (100%) - 62 496,

— the amount of kilometers (80%) - 49 997,

— the number of kilometres covered by the right of the option (20%) -12 499.

The contract referred to in point 3 shall be awarded for a period of 12 months.

4.In the event that during the term of the contract the value of the Contractor's remuneration does not reach the maximum remuneration, the Parties may, in accordance with a one-time extension of the contract by a maximum of 3 months, but not more than the point where the remuneration for services made by the Contractor will reach the maximum salary. The extension of the term in accordance with the previous agreement requires written form under the rigor of annulment.

Implementation of line courses (Service A) - course no 14/143

1. The subject of the contract is the provision to the Contracting Authority of Service A, consisting of the transport of Shipments (including Shipments containing Postal Shipments), including Contracts of which will constitute dangerous goods within the meaning of Article 2 (4) of the Act on 19 August 2011 the transport of hazardous materials under which the Contractor is obliged to accept consignments for carriage at the place and date set out in the Schedule for the implementation of Service A, as set out in Annex 1 to the draft contract, and issue the consignments accepted for carriage at the place specified therein appendix.

2. Under the provision of Service A, the Contractor undertakes:

(a) that the vehicle using which the Consignments are transported will arrive at the place of issue of the Shipments within the time limit set out in the Schedule for the implementation of Service A, as set out in Annex 1 to the draft agreement,

(b) where the place of acceptance of consignments for carriage is not the organizational unit of the Contracting Authority - the loading of the Consignments onto the vehicle and their placement in the vehicle at the place of acceptance of the consignments for carriage,

(c) where the place of release of the Shipments is not the organizational unit of the Ordering Party - the discharge of the Shipments from the vehicle at the place of release of the Shipments.

Course No: 14/143

Course coverage: Bailiks - Wrocław - Bailiks

Course circulation days: zw pt, sb and St. zw sb; ndz and pśw

The maximum amounts of services that can be commissioned to the Contractor by the Employer as part of the contract:

— maximum number of kilometers with the right option (100%) - 74 336,

— the amount of kilometers (80%) - 59 469,

— the number of kilometres covered by the right of option (20%) - 14 867.

3. The Contracting Authority provides for the award within 2 years from the date of award of this contract, the contract referred to in Article 388 (2), point (c) of the PZP. The scope of the above orders will consist of repetition of services from the basic order and will cover the following quantities of kilometres:

— maximum number of kilometers with option right (100%) -73 968,

— the amount of kilometers (80%) - 59 174,

— the number of kilometres covered by the right of the option (20%) -14 794.

The contract referred to in point 3 shall be awarded for a period of 12 months.

4.In the event that during the term of the contract the value of the Contractor's remuneration does not reach the maximum remuneration, the Parties may, in accordance with a one-time extension of the contract by a maximum of 3 months, but not more than the point where the remuneration for services made by the Contractor will reach the maximum salary. The extension of the term in accordance with the previous agreement requires written form under the rigor of annulment.

Implementation of line courses (Service A) - course no 14/135

1. The subject of the contract is the provision to the Contracting Authority of Service A, consisting of the transport of Shipments (including Shipments containing Postal Shipments), including Contracts of which will constitute dangerous goods within the meaning of Article 2 (4) of the Act on 19 August 2011 the transport of hazardous materials under which the Contractor is obliged to accept consignments for carriage at the place and date set out in the Schedule for the implementation of Service A, as set out in Annex 1 to the draft contract, and issue the consignments accepted for carriage at the place specified therein appendix.

2. Under the provision of Service A, the Contractor undertakes:

(a) that the vehicle using which the Consignments are transported will arrive at the place of issue of the Shipments within the time limit set out in the Schedule for the implementation of Service A, as set out in Annex 1 to the draft agreement,

(b) where the place of acceptance of consignments for carriage is not the organizational unit of the Contracting Authority - the loading of the Consignments onto the vehicle and their placement in the vehicle at the place of acceptance of the consignments for carriage,

(c) where the place of release of the Shipments is not the organizational unit of the Ordering Party - the discharge of the Shipments from the vehicle at the place of release of the Shipments.

Course No: 14/135

Course coverage: Komorniki - Gorzów Wlkp.- Komorniki

Course circulation days: sb and St.

The maximum amounts of services that can be commissioned to the Contractor by the Employer as part of the contract:

— maximum number of kilometers with the right option (100%) - 75 692,

— the amount of kilometers (80%) - 60 554,

— the number of kilometers covered by the right of option (20%) -15 138.

3. The Contracting Authority provides for the award within 2 years from the date of award of this contract, the contract referred to in Article 388 (2), point (c) of the PZP. The scope of the above orders will consist of repetition of services from the basic order and will cover the following quantities of kilometres:

— maximum number of kilometers with option right (100%) -75 096,

— the amount of kilometers (80%) - 60 077,

— the number of kilometres covered by the right of option (20%) - 15 019.

The contract referred to in point 3 shall be awarded for a period of 12 months.

4.In the event that during the term of the contract the value of the Contractor's remuneration does not reach the maximum remuneration, the Parties may, in accordance with a one-time extension of the contract by a maximum of 3 months, but not more than the point where the remuneration for services made by the Contractor will reach the maximum salary. The extension of the term in accordance with the previous agreement requires written form under the rigor of annulment.

Implementation of line courses (Service A) - Course no. 14/110, 14/139, 14/176

1. The subject of the contract is the provision to the Contracting Authority of Service A, consisting of the transport of Shipments (including Shipments containing Postal Shipments), including Contracts of which will constitute dangerous goods within the meaning of Article 2 (4) of the Act on 19 August 2011 the transport of hazardous materials under which the Contractor is obliged to accept consignments for carriage at the place and date set out in the Schedule for the implementation of Service A, as set out in Annex 1 to the draft contract, and issue the consignments accepted for carriage at the place specified therein appendix.

2. Under the provision of Service A, the Contractor undertakes:

(a) that the vehicle using which the Consignments are transported will arrive at the place of issue of the Shipments within the time limit set out in the Schedule for the implementation of Service A, as set out in Annex 1 to the draft agreement,

(b) where the place of acceptance of consignments for carriage is not the organizational unit of the Contracting Authority - the loading of the Consignments onto the vehicle and their placement in the vehicle at the place of acceptance of the consignments for carriage,

(c) where the place of release of the Shipments is not the organizational unit of the Ordering Party - the discharge of the Shipments from the vehicle at the place of release of the Shipments.

Course No: 14/110

Course relation: Komorniki - Gorzów Wlkp.

Course Circulation Days: Pśw

Course No: 14/110

Course relation: Gorzów Wlkp.- Komorniki

Course circulation days: n.

Course No: 14/110

Course relation: Gorzów Wlkp.- Komorniki

Course circulation days: pre-dawn with sb

Course No: 14/139

Course relation: Gorzów Wlkp.- Komorniki

Course Circulation Days: From St. and Bird

Course No: 14/139

Course relation: Komorniki - Gorzów Wlkp.

Course circulation days: zw sb; St. and trow

Course No: 14/139

Course relation: Komorniki - Gorzów Wlkp.

Course Circulation Days: sb of St. and Pśw

Course No: 14/176

Course relation: Gorzów Wlkp.- Komorniki

Course circulation days: sb and St.

Course No: 14/176

Course relation: Komorniki - Gorzów Wlkp.

Course circulation days: zw sb; ndz and pśw

Course No: 14/176

Course relation: Komorniki - Gorzów Wlkp.

Course Circulation Days: sb of St. and Pśw

The maximum amounts of services that can be commissioned to the Contractor by the Employer as part of the contract:

— maximum number of kilometers with the right option (100%) - 166 731,

— the amount of kilometers (80%) - 133 385,

— the number of kilometres covered by the right of the option (20%) - 33 346.

3. The Contracting Authority provides for the award within 2 years from the date of award of this contract, the contract referred to in Article 388 (2), point (c) of the PZP. The scope of the above orders will consist of repetition of services from the basic order and will cover the following quantities of kilometres:

— maximum number of kilometers with the right option (100%) - 165 390,

— the amount of kilometers (80%) - 132 312,

— the number of kilometres covered by the right of the option (20%) - 33 078.

The contract referred to in point 3 shall be awarded for a period of 12 months.

4.In the event that during the term of the contract the value of the Contractor's remuneration does not reach the maximum remuneration, the Parties may, in accordance with a one-time extension of the contract by a maximum of 3 months, but not more than the point where the remuneration for services made by the Contractor will reach the maximum salary. The extension of the term in accordance with the previous agreement requires written form under the rigor of annulment.