Building materials | Tenderlake

Building materials

Contract Value:
EUR 2M - 2M
Notice Type:
Contract Notice
Published Date:
22 March 2022
Closing Date:
19 April 2022
Location(s):
DE300 Berlin (DE Germany/DEUTSCHLAND)
Description:
Goods and logistics services - Framework agreement Material procurement for small construction items

The service advertised is a framework agreement for material procurement of small structural items for various properties in the state of Berlin.

It is advertised in 7 lots as follows:

Lot 1: Assembly and fastening equipment, hardware

Lot 2: Tools, occupational safety

Lot 3: Small items heating

Lot 4: Small sanitary items

Lot 5: Small items electric

Lot 6: Small items painter

Lot 7: Building materials

LOS_1_RV_Material Procurement_-_LOS_1_Assembly_and_fasteners_hardware

It is an order to be awarded that allows the retrieval of

provides services or goods whose individual prices are fixed but the quantity to be retrieved in the end is still unknown. In this respect, the contractor is not entitled to

Commissioning all positions and quantities. The advertised “required quantity/required

Units” is the annual average of orders from 2018 to 2021 for the previous area of application of law enforcement institutions, including a 25% surcharge due to the future lifting of the application restriction of the framework agreement to law enforcement institutions. In the future, as required by the application restriction of the framework agreement, will extend to all properties managed by the AG.

The remuneration for each individual position includes all services provided by the contractor, including all

costs incurred by him, such as personnel, wage, secondary wage, order, material, ancillary material, vehicle, travel time, general, rental, rental and overhead costs, risk and

profit etc., incl. Delivery costs from the manufacturer to the contractor are covered.

The unit prices do not include delivery costs from the contractor's location to the place of delivery. These flat-rate delivery charges (including proper packaging) must be shown separately in the corresponding section of the list of services.

LOS_2_RV_Material Sourcing_-_LOS_2_Tools_Occupational Safety

It is an order to be awarded that allows the retrieval of

provides services or goods whose individual prices are fixed but the quantity to be retrieved in the end is still unknown. In this respect, the contractor is not entitled to

Commissioning all positions and quantities. The advertised “required quantity/required

Units” is the annual average of orders from 2018 to 2021 for the previous area of application of law enforcement institutions, including a 25% surcharge due to the future lifting of the application restriction of the framework agreement to law enforcement institutions. In the future, as required by the application restriction of the framework agreement, will extend to all properties managed by the AG.

The remuneration for each individual position includes all services provided by the contractor, including all

costs incurred by him, such as personnel, wage, secondary wage, order, material, ancillary material, vehicle, travel time, general, rental, rental and overhead costs, risk and

profit etc., incl. Delivery costs from the manufacturer to the contractor are covered.

The unit prices do not include delivery costs from the contractor's location to the place of delivery. These flat-rate delivery charges (including proper packaging) must be shown separately in the corresponding section of the list of services.

LOS_3_RV_Material Procurement_-_LOS_3_Small Item_Heating

It is an order to be awarded that allows the retrieval of

provides services or goods whose individual prices are fixed but the quantity to be retrieved in the end is still unknown. In this respect, the contractor is not entitled to

Commissioning all positions and quantities. The advertised “required quantity/required

Units” is the annual average of orders from 2018 to 2021 for the previous area of application of law enforcement institutions, including a 25% surcharge due to the future lifting of the application restriction of the framework agreement to law enforcement institutions. In the future, as required by the application restriction of the framework agreement, will extend to all properties managed by the AG.

The remuneration for each individual position includes all services provided by the contractor, including all

costs incurred by him, such as personnel, wage, secondary wage, order, material, ancillary material, vehicle, travel time, general, rental, rental and overhead costs, risk and

profit etc., incl. Delivery costs from the manufacturer to the contractor are covered.

The unit prices do not include delivery costs from the contractor's location to the place of delivery. These flat-rate delivery charges (including proper packaging) must be shown separately in the corresponding section of the list of services.

LOS_4_RV_Material Procurement_-_LOS_4_Small Item_Sanitary

It is an order to be awarded that allows the retrieval of

provides services or goods whose individual prices are fixed but the quantity to be retrieved in the end is still unknown. In this respect, the contractor is not entitled to

Commissioning all positions and quantities. The advertised “required quantity/required

Units” is the annual average of orders from 2018 to 2021 for the previous area of application of law enforcement institutions, including a 25% surcharge due to the future lifting of the application restriction of the framework agreement to law enforcement institutions. In the future, as required by the application restriction of the framework agreement, will extend to all properties managed by the AG.

The remuneration for each individual position includes all services provided by the contractor, including all

costs incurred by him, such as personnel, wage, secondary wage, order, material, ancillary material, vehicle, travel time, general, rental, rental and overhead costs, risk and

profit etc., incl. Delivery costs from the manufacturer to the contractor are covered.

The unit prices do not include delivery costs from the contractor's location to the place of delivery. These flat-rate delivery charges (including proper packaging) must be shown separately in the corresponding section of the list of services.

LOS_5_RV_Material Procurement_-_LOS_5_Small Item_Electrical

It is an order to be awarded that allows the retrieval of

provides services or goods whose individual prices are fixed but the quantity to be retrieved in the end is still unknown. In this respect, the contractor is not entitled to

Commissioning all positions and quantities. The advertised “required quantity/required

Units” is the annual average of orders from 2018 to 2021 for the previous area of application of law enforcement institutions, including a 25% surcharge due to the future lifting of the application restriction of the framework agreement to law enforcement institutions. In the future, as required by the application restriction of the framework agreement, will extend to all properties managed by the AG.

The remuneration for each individual position includes all services provided by the contractor, including all

costs incurred by him, such as personnel, wage, secondary wage, order, material, ancillary material, vehicle, travel time, general, rental, rental and overhead costs, risk and

profit etc., incl. Delivery costs from the manufacturer to the contractor are covered.

The unit prices do not include delivery costs from the contractor's location to the place of delivery. These flat-rate delivery charges (including proper packaging) must be shown separately in the corresponding section of the list of services.

LOS_6_RV_Material Procurement_-_LOS_6_Small Item_Painter

It is an order to be awarded that allows the retrieval of

provides services or goods whose individual prices are fixed but the quantity to be retrieved in the end is still unknown. In this respect, the contractor is not entitled to

Commissioning all positions and quantities. The advertised “required quantity/required

Units” is the annual average of orders from 2018 to 2021 for the previous area of application of law enforcement institutions, including a 25% surcharge due to the future lifting of the application restriction of the framework agreement to law enforcement institutions. In the future, as required by the application restriction of the framework agreement, will extend to all properties managed by the AG.

The remuneration for each individual position includes all services provided by the contractor, including all

costs incurred by him, such as personnel, wage, secondary wage, order, material, ancillary material, vehicle, travel time, general, rental, rental and overhead costs, risk and

profit etc., incl. Delivery costs from the manufacturer to the contractor are covered.

The unit prices do not include delivery costs from the contractor's location to the place of delivery. These flat-rate delivery charges (including proper packaging) must be shown separately in the corresponding section of the list of services.

los_7_rv_material sourcing_-_los_7_materialsmaterials

It is an order to be awarded that allows the retrieval of

provides services or goods whose individual prices are fixed but the quantity to be retrieved in the end is still unknown. In this respect, the contractor is not entitled to

Commissioning all positions and quantities. The advertised “required quantity/required

Units” is the annual average of orders from 2018 to 2021 for the previous area of application of law enforcement institutions, including a 25% surcharge due to the future lifting of the application restriction of the framework agreement to law enforcement institutions. In the future, as required by the application restriction of the framework agreement, will extend to all properties managed by the AG.

The remuneration for each individual position includes all services provided by the contractor, including all

costs incurred by him, such as personnel, wage, secondary wage, order, material, ancillary material, vehicle, travel time, general, rental, rental and overhead costs, risk and

profit etc., incl. Delivery costs from the manufacturer to the contractor are covered.

The unit prices do not include delivery costs from the contractor's location to the place of delivery. These flat-rate delivery charges (including proper packaging) must be shown separately in the corresponding section of the list of services.

Download full details as .pdf
The Buyer:
Land Berlin (Sondervermögen Immobilien des Landes Berlin), vertreten durch die BIM Berliner Immobilienmanagement GmbH
CPV Code(s):
31100000 - Electric motors, generators and transformers
31300000 - Insulated wire and cable
31660000 - Carbon electrodes
31681200 - Electric pumps
31681410 - Electrical materials
31700000 - Electronic, electromechanical and electrotechnical supplies
31720000 - Electromechanical equipment
31730000 - Electrotechnical equipment
31731000 - Electrotechnical supplies
38552000 - Electronic meters
39224210 - Painters' brushes
39715000 - Water heaters and heating for buildings; plumbing equipment
42131110 - Central-heating radiator valves
42131400 - Sanitary taps, cocks
42600000 - Machine tools
42620000 - Lathes, boring and milling machine tools
42630000 - Metal-working machine tools
42640000 - Machine tools for working hard materials except metals
42650000 - Pneumatic or motorised hand tools
42660000 - Soldering, brazing and welding tools, surface tempering and hot-spraying machines and equipment
42670000 - Parts and accessories of machine tools
42931140 - Rotary equipment for centrifuges
42968200 - Sanitary dispensing machines
43830000 - Power tools
44000000 - Construction structures and materials; auxiliary products to construction (except electric apparatus)
44100000 - Construction materials and associated items
44111000 - Building materials
44111400 - Paints and wallcoverings
44111530 - Electrical insulating fittings
44115200 - Plumbing and heating materials
44115220 - Heating materials
44141100 - Electric conduit
44316000 - Ironmongery
44411000 - Sanitary ware
44500000 - Tools, locks, keys, hinges, fasteners, chain and springs
44510000 - Tools
44512000 - Miscellaneous hand tools
44514000 - Tool handles and tool parts
44600000 - Tanks, reservoirs and containers; central-heating radiators and boilers
44620000 - Central-heating radiators and boilers and parts
44800000 - Paints, varnishes and mastics
44810000 - Paints
44812000 - Artists' paints
44812200 - Oil and water paints
44812210 - Oil paints
44812220 - Water paints
44812320 - Signboard painters' colours
44812400 - Decorating supplies
45232460 - Sanitary works