- Demolition of 2 residential buildings and further basement walls,
- production of approx. 130 m of water embankment,
- New construction of approx. 50 m HWS wall with flat foundation,
- approx. 8 m extension of a pedestrian bridge,
11.5 m excavation pit shoring, depth 1.5-3.9 m
3823 m³ soil loosen, load, BK 3-5, ≤ Z2 according to TR LAGA
6012 m² explosive ordnance investigation (surface sounding 3202 m² construction site and 2810 m² water)
205 m slope foot protection, block stone template 1 row, minimum weight 4.5 t
525 m² insert in concrete made of hydraulic building blocks (gneiss), HMB 3000/6000
181 m³ Filling from stones Foot template seawall, HMB 300/1000
86.0 m² dry stone wall with storage block stones, KL 60-150 cm H to 5 m
5.30 m extension bridge field, steel construction with wooden covering
393 m Open water retention Flöha
48.0 pcs underpinning/building protection/slope protection with micropile, Ø 100 mm, length 7.0 m to 10.0 m
26.0 m³ shotcrete C 25/30 for excavation pit protection
2.00 pcs large bored piles (pile diameter 0.62 m, length approx. 7.3 m)
28.0 t reinforcing steel BSt 500 B
220 m³ Reinforced concrete C 30/37 (foundation, ramp, wall shaft)
12,20 m³ Reinforced concrete C 25/30 LP (cap)
6952 m³uR gutting and complete demolition Freiberger Straße 9 + 11
295 m² Removal and separation of asbestos cement panels AVV 17 06 05*
70 m3 Removal and separation of insulation materials AVV 17 06 03*
149 m² veneering retaining wall made of natural stone (gneiss)
65.7 m filling rod railing on retaining wall
6.16 m² Mobile protective wall system IBS as dam beam system, stowage height 773 mm
770 m² asphalt paving to accommodate roadway, thickness above 3-6 cm
1140 m² asphalt base course made of AC 22 T N, thickness 8 cm
1330 m² asphalt surface course made of AC 8 D N, thickness 4 cm