The Netherlands Enterprise Agency (Rijksdienst voor Ondernemend Nederland)invites companies to submit a tender. The objective of the tender procedure is the supply of meteorological and oceanographic data (hereinafter Metocean data) for the Hollandse Kust (west) Wind Farm Zone (HKWWFZ) and Ten Noorden van de Waddeneilanden Wind Farm Zone (TNWWFZ), obtained through field measurements. The field data are to be obtained by means of 2 individual systems equipped with a LiDAR system to measure wind properties and dedicated instrumentation to measure wave and current properties.
The tender is divided into 2 lots:
Lot 1 concerns HKWWFZ,
Lot 2 concerns TNWWFZ.
Companies can submit an offer for one lot or both.
It is the goal that prior to the closing of the HKWWFZ permit tender (expected in 2020) preferably 24 months of validated data measured at the HKWWFZ are available.
It is the goal that prior to the closing of the TNWWFZ permit tender (expected in 2022) preferably 24 months of validated data measured at the TNWWFZ are available.