Excavation of the excavation pit of the new building TO-03 workshop, TO-02 auditorium/media library and the TO-04 basement floor. Measures to stabilize embankments.
Excavation of the excavation pit of the new building TO-03 workshop, TO-02 auditorium/media library and the TO-04 basement floor. Measures to stabilize embankments.