Metal construction and locksmith work as part of the conversion and renovation of a school
As part of the renovation and partial conversion of a school building (B) from the 1970s, manufactured in large panel construction (WBS 70), not basement, 4 full floors, as well as a largely free-standing building with a swimming pool system (therapy bath), manufactured in conventional construction, basement, 1 full floor, the following construction services are awarded in public tender:
The metal construction work / Locksmith House B includes:
- 7 sheet steel doors inside with fire protection requirements
- 4 sheet steel doors inside without fire protection requirements
- 1 canopy main entrance
- 2 canopies on elevator doors,
- 55m handrail staircase at vorh. Railing
- 86m handrail diagonal wall in staircase
- 333m handrail horizontal wall corridors
- 4.2m railing with filling rods outside main entrance
- 2.6m handrail outside
- 18,1m2 grating covers inside
- 43m angle profiles 30x3 for grate covers
- 9m angle profiles 100x50x8 as support grating covers
- 2.8x2.0m lattice fence with gate inside
- 4 bollards
The metal construction work / locksmith therapy bath includes:
- 1 sheet steel door outside slip door 1pcs,
- 8 vorh. Refurbishing sheet steel doors
- 2 vorh. Refurbish railings with filling rods
- 43.5m railing with filling rods outside
- 19m handrail on railing outside
- Barrier railing and gate in front of stairs
- 4.8m demolition before. Handrail
- 5.5m handrail staircase
- 15.5 grating covers adjust basement light shafts
- Increase 2 ladders in basement light shafts
- 3 trellises 24 m3 from reinforcement mats outside