Specialist planning Structural design according to § 51 HOAI, LPH 1-6 and thermal building physics, stepwise commissioning.
The city of Lauenburg / Elbe plans the conversion of a former hotel for the city library and the city archives of Lauenburg / Elbe.
The building plot is located in the old guard 8 in 21481 Lauenburg / Elbe. It has an area of 1 500 m
The building complex is the only remaining historical building in the area of the "Old Guard". It was rebuilt in 1850 as the "Gasthof zum Adler" and used as a hotel "Stappenbeck" from 1891 until the 1980s. It is no longer under monument protection. After several renovations, the monument value was abolished in 2000. Since then, the building has undergone varying uses by municipal and private institutions. After the revision of the monument list of Lauenburg / Elbe, the building currently has the status "intended for the list".
As part of the urban development project "Active Urban and Suburban Centers" and possibly with the "Investment Pact", the conversion and refurbishment of the building for use by the city library and city archives is planned as an important element for the revitalization of the city center. At the same time, the USP is the only building with a historical reference to be worked out in the inner city environment and, at the same time, transforms the building into the present day for the requirements of modern use as a media center under the aspect of digitization. A sense for the interplay of historical building fabric and modern architectural elements in the draft is required for this project and must be proven on the basis of empirical values.
The existing building has a gross floor area of approx. 1 600 m
For library and archive use, according to the provisional room program, a gross floor area of approx. 2 200 m
For this purpose, planning offices are invited to take part in the competition, which cover the performance planning of technical planning structural design and have implemented similar measures in the past.
The work phases 1-6 in the performance picture according to § 51 HOAI as well as thermal building physics are to be processed. The commissioning will take place gradually.
The following procedure is carried out:
In phase 1, potential applicants are invited to participate and submit the application with the required supporting documents.
In phase 2, the requests to participate will be examined and the number of eligible candidates will be limited.
Phase 2 candidates will be invited separately for a negotiated procedure.
The costs of the KG 300 were limited to a volume of max. EUR 3 300 000 gross. The above-mentioned construction cost ceiling of EUR 3.3 million gross is to be understood as a value at which the draft must be aligned at all stages of the project and which must already be checked in the preliminary draft for its feasibility.
Procedural procurement documents are posted on the e-procurement platform for the procedure under http://www.e-vergabe-sh.de/vergabeplattform/bekanntmachungen/.