Specifically, it is a question of establishing the terms and conditions under which the contractor will carry out tasks to support the sheet metal work of the Air and Space Force Weapon Systems: E.25 (C-101), UD.13T (CL-215T), UD.14 (CL-415), AE.9 (F-5B), C.15 (EF-18) and, if applicable, C.16 (EF-2000) at the Maestranza Aérea de Albacete (MAESAL) in order to guarantee their continuous operability.
Specifically, it is a question of establishing the terms and conditions under which the contractor will carry out tasks to support the sheet metal work of the Air and Space Force Weapon Systems: E.25 (C-101), UD.13T (CL-215T), UD.14 (CL-415), AE.9 (F-5B), C.15 (EF-18) and, if applicable, C.16 (EF-2000) at the Maestranza Aérea de Albacete (MAESAL) in order to guarantee their continuous operability.