The assignment includes the laying of approximately 7 km water and sewage pipes. The pipeline route is mainly across fields. Numerous controlled drillings. A drop tank (a pressure reservoir) and various shafts.
Get our periodical newsletter about how sell more to the public sector and how to make the most of Tenderlake.