The initial assignment is to supply 300 GFT container enclosures including concrete base plates. This initial order must be delivered in 3 partial deliveries, with each partial delivery being 100 items. The first partial delivery must be delivered in week 36 of 2020. The last partial delivery must therefore be delivered in week 42 of 2020. During the term of the agreement, the client can order a maximum of 300 GFT container enclosures (incl. Concrete base plates). The placement (partially or completely) of the delivered GFT container housings and the assembly / installation of the access control systems is an optional part of the assignment.
Initially 300 pieces. In addition, possibly another 300 pieces.