The contract concerns the complement of the auscultation device of the Fabrèges dam
Description of the phases of the services/works/supplies, without the following list of works being considered exhaustive:
- Plans and studies of execution, plans of detail and synthesis, calculation notes, surveys, geotechnical missions G3, measurements and evaluations necessary for the proper understanding of the problems to be solved on the site
- Analyze existing plans and technical documents on the structure
- The installation of the site, means of access and handling (s) necessary for the realization of the works
- Temporary protection until reception,
- Write operating procedures and risk analyses of operations
- Participation in the ICP, the establishment of the prevention plan and reception operations,
- Tests of any kind including all the accessories to carry them out,
- The provision of all certificates, reports requested by the project manager and/or the control office,
- The supply of parts and structures, their transport and their installation on the ground, including all the necessary requirements,
- The supply of materials, materials,
- Carrying out all the work necessary for the proper installation, installation and reception of equipment and supplies,
- The provision of the deliverables described in the DT
- Waste management, site cleaning
- General coordination of the site