Market TR 206380 is a framework for the sanitation and extension of the capacity of the existing L50A line between Ghent and Bruges from 2 to 4 lanes. The main goal is to start the Y Stuivenbergstraat (km 85.4), replacing the current Y Oostkamp (km 87.0). In addition, the contract includes the preparatory work between km 80.0 and Y Stuivenbergstraat (km 85.4), adaptations of the L50A / 5, including along the L50A (from km 87.0 to km 93.1).
This special specification for railway technical loads contains the following elements:
- track works,
- catenary work,
- signaling work,
- PDST (Power Distribution & subSTations),
- civil engineering,
- platform work,
- development work in the surroundings,
- Roadworks.
Market TR 206380 is a framework for the sanitation and extension of the capacity of the existing L50A line between Ghent and Bruges from 2 to 4 lanes. The main goal is to start the Y Stuivenbergstraat (km 85.4), replacing the current Y Oostkamp (km 87.0). In addition, the contract includes the preparatory work between km 80.0 and Y Stuivenbergstraat (km 85.4), adaptations of the L50A / 5, including along the L50A (from km 87.0 to km 93.1).
This special specification for railway technical loads contains the following elements:
- track works,
- catenary work,
- signaling work,
- PDST (Power Distribution & subSTations),
- civil engineering,
- platform work,
- development work in the surroundings,
- Roadworks,
- hydraulic.