Construction work for water and sewage pipelines | Tenderlake

Construction work for water and sewage pipelines

Contract Value:
EUR 6M - 6M
Notice Type:
Contract Notice
Published Date:
22 December 2023
Closing Date:
20 January 2024
Location(s):
PT119 Ave (PT PORTUGAL)
Description:
PRC_0377/2023_GAE - AA1004 - Water Supply Contract for the S. Cosme Valley (Vila Nova de Famalicão)

Regarding the "high" network, the Águas do Norte, SA project is divided into three zones:

- Zone 1:

Between the chiping/diversion in the existing FFD DN 600mm elevating pipeline E.N. 206 and the Vale de S. Martinho bypass chamber, the pipeline will be carried out in FFD DN350mm (1,474 m). From this chamber it goes in FFD DN300mm to the Vale S. Martinho Reservoir (1,803 m) and in DN200mm to Vale S. Cosme (3,568 m). The new gravitational conduit between the Vale S. Martinho Reservoir and the Vale de S. Martinho diversion chamber will be carried out in FFD DN200mm (1,795 m).

In this area, a "low" delivery point to the network is planned.

- Zone 2:

Implementation of the Torre de Cima Reservoir (400 m3), the pumping station (EE1) and the respective pumping duct, with an extension of 1,886m in FFD DN 80mm.

- Zone 3:

Implementation of the Paço Reservoir (400m3), the pumping station (EE2) and the respective pumping duct, with an extension of 1,868m in FFD DN 80mm.

As for the "downtown" network, the project of the Municipality of Vila Nova de Famalicão foresees the installation of 8,965.00 m of HDPE pipe, with diameters ranging from 90mm to 160mm, 7 pressure reducing valves, 220 branches and 17 fire frames.

Regarding the "high" network, the Águas do Norte, SA project is divided into three zones:

- Zone 1:

Between the chiping/diversion in the existing FFD DN 600mm elevating pipeline E.N. 206 and the Vale de S. Martinho bypass chamber, the pipeline will be carried out in FFD DN350mm (1,474 m). From this chamber it goes in FFD DN300mm to the Vale S. Martinho Reservoir (1,803 m) and in DN200mm to Vale S. Cosme (3,568 m). The new gravitational conduit between the Vale S. Martinho Reservoir and the Vale de S. Martinho diversion chamber will be carried out in FFD DN200mm (1,795 m).

In this area, a "low" delivery point to the network is planned.

- Zone 2:

Implementation of the Torre de Cima Reservoir (400 m3), the pumping station (EE1) and the respective pumping duct, with an extension of 1,886m in FFD DN 80mm.

- Zone 3:

Implementation of the Paço Reservoir (400m3), the pumping station (EE2) and the respective pumping duct, with an extension of 1,868m in FFD DN 80mm.

As for the "downtown" network, the project of the Municipality of Vila Nova de Famalicão foresees the installation of 8,965.00 m of HDPE pipe, with diameters ranging from 90mm to 160mm, 7 pressure reducing valves, 220 branches and 17 fire frames.

Download full details as .pdf
The Buyer:
Águas do Norte, S. A.
CPV Code(s):
45231300 - Construction work for water and sewage pipelines
45247270 - Reservoir construction works