small building maintenance works requested by the health establishments of the GHT Sud Lorraine, according to the following division: (Zone 1) CHRU of Nancy - cH Saint Charles de Toul - cHI of Pompey / Lay Saint Christophe - cH of Pont-à-Mousson (Zone 2) Psychotherapeutic Center of Nancy-Laxou (Zone 3) CH of Saint-Nicolas-De-Port - 3 H Health - cH of Lunéville (Zone 4) CH Saint Charles de Commercy (Zone 5) CH Ravenel (Zone 6) CH Saint Jacques de Dieuze: The Multi-Successful Framework Agreement (maximum 3 economic operators per lot subject to a sufficient number of applications and tenders) will be concluded in a mixed form, executed, on the one hand, by the issuance of purchase orders (according to a so-called 'Cascade' method) and, on the other hand, by the conclusion of subsequent contracts. The Framework Agreement will be established without minimum amount and with a maximum value per lot
AsbestosAsbestos
Electricity (high and low current)Electricity (high and low current)
Fire detectionFire detection
PVC exterior carpentryPVC exterior carpentry
locksmith Aluminum exterior carpentrylocksmith Aluminum exterior carpentry
interior carpentry and layoutinterior carpentry and layout
Flooring (soft and hard floors)Flooring (soft and hard floors)
Painting and façadePainting and façade
plasteringplastering
vrd Structural work Demolitionvrd Structural work Demolition
ScaffoldingScaffolding
SealingSealing
BlanketBlanket
calorifugecalorifuge
Heating ventilation air conditioningHeating ventilation air conditioning
PlumbingPlumbing
WiringWiring