Renovation and conversion of the kitchen building of the former barracks in 54439 Saarburg Lot 16 Tile work, Lot 17 Flooring work, Lot 18 Concrete renovation work
tiling workLot 16 tile work -120 m² concrete floor area primer and tile spatula (basement)
-120 m² Entkopplungsmatte
-Cut off 290 lfdm edge insulation strips
-120 m² floor tiles, 20 x 20 cm, R10A (basement)
-230 m² floor tiles, 60 x 60 cm, R10A; Colour trication dimension 597 x 597 x 6 mm (ground floor and TH)
-145 ldfm stair steppe tile as a step leading edge marking with milled grooves, format 5 x 60 cm, R10A.
-85 m² tiles 30x60cm for stepping and setting steps; Color trication dimension 297 x 597 x 6 mm
-65 m² allowance for covering the step and setting steps with flooring tiles on coarse ground.
-31 lfdm stainless steel movement joint profile
-27 lfdm rubber finish stainless steel, 7 mm, with an 87° angle subsequent end leg
-430 m² basic cleaning of the floor covering surfaces, incl. TH
-Lay out 350 m² milk bag carton
-145 lfdm stairs with stair protection fleece
-95 m² wall tiles, 20 x 20 cm, basement
-115 lfdm base tiles, 7.5 x 20 cm, basement
-115 m² wall tiles, 30 x 60 cm, ground floor; Color cation size 597 x 597 x 6 mm
-280 lfdm base tiles, 7.5 x 60 cm, ground floor and TH
-560 lfdm silicone-based continuous load joints
-106 lfdm flooring / corner profile stainless steel, 7 mm
-43 pcs inner and outer corner of flooring closure
-2 pc crystal mirror incl. splinter protection film, 80 x 60 cm, 6 mm
-1 pc crystal mirror incl. splinter protection film, 60 x 100 cm, 6 mm
-2 pcs crystal mirror incl. splinter protection film, 100 x 100 cm, 6 mm
-2 pcs special angle frame for inserted floor mat
-2 st entrance mat for interior, fine ribs, fire behaviour Cfl-s1 according to DIN EN 13501-1 (formerly B1 flame retardant)
Flooring workLot 17 flooring works -240 m² vinyl flooring, design flooring
-28 lfdm False joints, cracks in screed or movement joints force-locked
-93 lfdm skirting board with wood-based core
-25 lfdm flooring end profile in stainless steel
-7 lfdm floor covering expansion joint profile in Edeltahl
-50 lfdm silicone-based continuous load joints
-Lay out and secure 240 m² milk bag carton
-1 pc special angle frame for inserted floor mat, 199 x 123 cm, rectangular production
-1 pc entrance mat, fine ribs, 199 x 123 cm, fire behaviour Cfl-s1 according to DIN EN 13501-1 (formerly B1 flame retardant)
concrete renovation workLot 18 Concrete rehabilitation works -470 m² Protective measures
-470 m² working and protective scaffolding
-470 m² subsoil inspection
-10 St Abreißfestigkeit
-100 m² concrete surfaces
-470 m² underground preparation – sandblasting of the entire concrete surface
-60 St Auflagertaschen
-155 m² reinforcement – Q257, Bst 500 M
-650 pcs composite anchor installation, Bst 500 S, 8mm, L approx. 15 cm
-3 to Tragbewehrung, Bst 500 S
-155 m2 shotcrete C35/45, B8 according to DIN 18551, up to 8 cm, splash